Purple Line PLW2

PLW2 is the central section of the Purple Line, extending through Givatayim, Ramat Gan, Kiryat Ono and Givat Shmuel. The alignment continues eastward from Tel Aviv through the Givatayim area and along Aluf Sadeh Road, crosses Highway 4, and proceeds through Ramat Ef’al and the Sheba Medical Center area, with one branch continuing toward Bar-Ilan University and Givat Shmuel.

The section includes complex engineering works, including a light rail bridge over Highway 4, a station in the Aluf Sadeh Interchange area, a bicycle bridge, underpasses and grade-separated sections, pumping stations, roadworks and urban development, as well as the construction of tracks, stations and railway systems.

  • Length: 7 km
  • Number of stations: 9
  • Daily ridership: 256,000
  • Frequency: 4 minutes
  • Planned opening: 2028

PROJECT IN NUMBERS

Length
0 km
Stations
0
Daily ridership
0
Frequency
0 min
Planned opening
0